In this post we are sharing a pdf file with Sample Reports from Rabio.
Reports are produced from the Construction Demo Project which is available 24/7 here.
Construction Project Demo
The construction demo project in Rabio is based on a hypothetical bridge construction project. Typically it is a cost control data system used to control construction budgeting and costs.
The scope of the demo project is the construction of a bridge with 2 separate lanes (north and south) including earthworks, roadworks, and MSS parking areas as direct works.
The duration of the project is 18 months starting from January 2016 until June 2017.
A cost control procudure is followed on this demo project based on Cost Centers (CC) and Cost Type Keys (CTK) following a typical Cost Breakdown Structure (CBS).